Ataköy Towers B 20/2 134 Bakırköy İstanbul
+90 212 812 50 50
info@mensisgroup.com
Follow Us
Home PageOur Fields Of Activity
FIELDS OF ACTIVITY

WE CONTRIBUTE TO ENERGY DISTRIBUTION, TRANSMISSION AND PRODUCTION

With the growth of the Turkish economy, the need for electricity consumption is also increasing. According to the report presented by the EPDK, electricity consumption is expected to reach 392 TWh in 2020, an annual increase of about 6.9% according to the high scenario, and 357 TWh, an average annual increase of 5.5% according to the base scenario.

0PRODUCTION
0TRANSMISSION
0DISTRIBUTION

As Mensis Energy, we operate in the fields of Energy Investment Consultancy, Automatic Meter Reading System (AMR), R&D, Infrastructure Projects and Solar Power Plants (SPP) in Turkey’s energy sector.

With our efficiency and digitalization solution models, we contribute to the maximum realization of production, distribution and transmission activities of our customers operating or investing in the energy field.

AMR PROJECTS

By digitizing the electricity distribution sector, we facilitate processes.

INFRASTRUCTURE PROJECTS

We carry out plant works of High Voltage (HV) and Medium Voltage (MV) electrical distribution networks.

SOLAR POWER PLANT PROJECTS (SPP)

We are building solar power plants with a “0” emission vision for the future.

FIELDS OF ACTIVITY

ENERGY CONSULTING

– Electricity tariffs consultancy
– Transmission and production sector communication management
– Relations with industry and stakeholders
– Support for electricity sector legislation
– Deployment services audits
– Development of production activity optimizations
– Customer satisfaction-oriented information support
– Implementation of smart networks
– Production and storage activities on the issues of electrical consulting services in the distribution system and in this context, public institutions, and public and private entities and legal, administrative, commercial and consulting real and legal persons in business relationship with that third relationships and work consists of.

FIELDS OF ACTIVITY

AUTOMATIC METER READING SYSTEM (AMR)

The electricity distribution industry’s first and most successful project was developed with the experience of our management team that administers AMR Communication Unit (MODEM), remote meter reading, open-cut, alarm monitoring jobs in energy management with Decision Support reports we can make your job easier.

Along with automatic meter reading, astronomical time Relay for lighting facilities management, on, off operations, substations data, alarms, monitoring, etc. with its features, AG Scada allows network management.

We offer ideal solutions for Industrial Zones and Electricity Distribution Companies.

FIELDS OF ACTIVITY

R&D

The project for the development of planned and Predictive Maintenance Systems for the Electricity Distribution Network includes data creation, process design, implementation and development software.

Distribution Storage depth / Electrical 3D project Electrical 3D project

A better understanding of the current status of the energy storage potential in Turkey and to provide recommendations for future growth, distribution companies, preparation of information and analytical qualitative and quantitative analysis of the data collected by the electricity of the form of the efficiency of the electricity grid were modernized and distributing to buy tive, and cleanup aims to provide flexibility.

The aim of this project is to investigate the storage capacity that will be needed in the future, which can be operated, taking into account the actual technical parameters of the distribution network, and to provide recommendations for possible storage locations.

FIELDS OF ACTIVITY

INFRASTRUCTURE

We carry out plant works of High Voltage (HV) and Medium Voltage (MV) electrical distribution networks

FIELDS OF ACTIVITY

SOLAR POWER PLANTS (SPP)

At Mensis energy, we provide official permits and approvals related to trijen, kojen, solar, wind, biogas licensed, unlicensed energy production, connection application and call letter tracking in distribution companies, project construction and approval services, feasibility and turnkey installation and temporary acceptance operations.
Our country is our capacity of European countries such as Germany (SPP) Solar Power Plant owned about half of the radiation up to 10 times to achieve near-zero emissions for the future planning, the importance of energy use in international trade green, the cost of energy produced in regulated facilities to be established tariff 1/4 – 1/5 serious drop in this context and the creation of a capacity requirement of return for reasons such as tenure, we turned our focus into the sun.
In the actual location, we create a production projection by simulating three-dimensional modelling, compatible equipment selection, loss-minimizing design, high-resolution data sets and minute-sensitive PVsyst 7 program.

We contribute to our country’s clean future goal in the emission of emissions that cause global warming and climate change, which all the countries of the world are fighting jointly. Julianne Feinstein.
Our Tera (SPP) Solar Power Plant project in Ordu prevents 3144.11 tons of CO2 emissions over 25 years of system life.
Our Southeast (SPP) Solar Power Plant project, located in Gaziantep, prevents 10,460.57 tons of greenhouse gas emissions during its 30-year System life.

(SPP) Solar Power Plant PROJECT AND IMPLEMENTATION PROCESS

3D Modeling-Design
Optimization-Feasibility
Project-Installation
Location
Radiation - Roof Direction & Slope
Shadow Elements
Product Equipment Selection
Correct Configuration - Installation Quality

CENTRAL OFFICE

Ataköy 7-8-9-10. Kısım Mah. Çobançeşme E-5 Yan Yol Cad. Ataköy Towers B 20/2 134 Bakırköy İstanbul

+90 212 812 50 50

info@mensisgroup.com

NEWSLETTER & SOCIAL MEDIA

Be alerted to news
Invalid or empty email
You have successfully subscribed to the newsletter.
Something went wrong. Your subscription failed.

Follow Us